| |
Main Steps and Processes
The
main steps in TOXCHEM+ include:
- Process Configuration:
Drop process icons on the drawing area
- Process Connection:
connect the process flows with recycles and multiple flow splits
- Process Data Input:
Specify the size and characteristics
- Model Run: Produce the
output on screen, in hard copy or electronic file.
The
processes in TOXCHEM+ include:
- Process drain
- Lift station
- Sewer reaches (open
and closed)
- Manhole drop
structures (open and closed)
- Grit chamber
- Equalization basin
- Mixed/aerated
equalization basin
- Process channel
- Dissolved air
flotation
- Primary clarifier
- Powdered activated
carbon adsorption
- Activated sludge
- Secondary clarifier
- Trickling filter
- Cooling tower
- Rotating biological
contactor
- Polishing pond
- Anaerobic digester
- Aerobic digester
- Chlorine
disinfection
- General air
treatment
- Sludge centrifuge
- Sludge belt filter
press
- Sludge drying bed
TOXCHEM+ FAQs
>

|
|